ExperimentalProfile format under testing · reviewed 11 August 2026

Electoral constituency M · East

Micoud South

Area covered

A southeast constituency extending from the Troumassee River through Ti Rocher, Desruisseaux, Blanchard, Anse Ger and Canelles, with agricultural hinterland, road-frontage development/investment proposals and exposed coast.

2022 household population
8,734
provisional Census
Private households
3,232
2022 Census
2010–22 reported change
+19.2%
household population
Named community entries
32
official descriptions and polling records

“Household population” is not total resident population. It counts people recorded in private households in the provisional 2022 constituency tables and excludes people outside private households.

How to read this profile

Facts, analysis and open questions are kept separate. A proxy is a stand-in from a different geography. A project announcement is not proof of completion or results. Questions are prompts for local checking, not findings of neglect.

What stands out in Micoud South?

Local economy

What supports work and livelihoods

  • Agriculture and livestock are core activities in the broader Micoud district, with farms and related transport/input/market services across the rural communities. Constituency output and employment are not separately published.
  • Construction, land development and highway-facing commerce are visible growth channels around Beauchamp, Desruisseaux and Canelles. The Beauchamp project marketed serviced residential/commercial lots; current build-out and employment are unknown.
  • Canelles was approved as a Citizenship by Investment resort project and remains listed by the CIP Unit, but no authoritative opening/completion notice was found. It should be treated as prospective hospitality employment, not an operating major employer.
  • Schools, wellness/community facilities, public administration, retail, construction and transport provide local service employment. No current employer register or firm-level employment data were found.
Strengths

What this area can build on

  • Completed drainage and national-highway works provide a designed platform for better flood resilience and connectivity; post-completion flood outcomes and maintenance performance were not verified.
  • A large and growing 2022 household population, agricultural land base and several sizeable communities provide a domestic market and labour pool.
  • Beauchamp serviced-land development and the proposed Canelles resort signal investor interest and potential construction/hospitality demand, though current delivery and local benefit are not established.
  • Blanchard's planned multipurpose resilient centre could support training, enterprise, culture and emergency shelter if completed and well managed.
Pressure points

What needs attention

  • Water capacity and reliability constrain housing, agriculture and business across Micoud; the proposed large upgrade remains at concept-development rather than verified implementation.
  • Flood risk persists after construction because drainage requires maintenance and the design standard does not eliminate events above 1-in-25 rainfall or future climate effects.
  • The wider Micoud district's female unemployment rate was 20.04% in 2025 and its historical poverty headcount was 31.2% in 2016; these are important but non-constituency proxies.
  • Major development projects have limited current public milestone information: no verified Blanchard opening, Beauchamp build-out report or Canelles completion/operation notice was found.

Population, participation, local action and source types.

Household populationProvisional Census comparison
20107,326
20228,734

+19.2% reported change

Official published turnoutPublished-register denominator · constituency and 17-seat median
Micoud South50.8%17-seat median50.5%

3,964 ballots cast against 7,806 published register entries. Register-quality concerns can affect this denominator; do not read the comparison as a resident-adult participation estimate. Why this matters →

Local action tracker6 constituency-linked records in this research base
Delivered or operating2
In progress1
Planned or funded2
Status needs checking1

Status labels organise the record. They do not score performance.

Source types20 records linked on this page
Official / primary
11
Institutional / older
8
Specialist / community
1
Other / needs checking
0

These labels show where each source came from. They do not score whether a project worked.

The communities inside Micoud South.

These names come from official electoral descriptions and polling-place records. A community may cross everyday social or service boundaries.

32 selected place labels

  • Anse GerM3a
  • BeauchampM2a
  • BeausejourM2a
  • BlanchardM3c
  • CalypsoM2a
  • Camp BrigaudM3b
  • CanellesM3a
  • CazukaM1
  • ChiqueM3c
  • ChoucomelM2a
  • DelomelM3b
  • Des BlanchardM2a · M2b
  • DesruisseauxM3b
  • DugardM1
  • En MangoM3b
  • FondM3b
16 additional named entriesOpen listClose list
  • Fond D'OrM1
  • GomierM2a · M3c
  • GouetteM3c
  • L'Eau MineurM1
  • La CourvilleM2b
  • LezyM3c
  • London RoadM3b
  • MoreauM2a
  • Morne VientM3c
  • Paix BoucheM2b
  • PlanardM1
  • SautM2b
  • St Helen EstateM3a
  • Ti RocherM2a
  • Tou CochanM2a
  • TroumasseeM1

32 of 32 entries carry a polling-district code in this release. A missing code means it was not present in the assembled source rows, not that the place sits outside a polling district.

Boundary resources

Check the official description and reference map.

Micoud South reference map (PDF)Central Statistical Office · map vintage 2010 (opens in a new tab)Current constituency descriptionSaint Lucia Electoral Department · site availability can vary (opens in a new tab)

The CSO PDF is an older official reference map with a 2010 map vintage. It may not show later boundary or coding changes. Use it alongside the current official Electoral Department description when that page is available.

Schools, health, safety and climate information.

These notes identify assets, service gaps and risks. They do not turn the number of notes into a performance score.

Education

Schools, skills and community buildings

  • Anse Ger Secondary, Desruisseaux Combined and Blanchard Combined are key school facilities reflected in official polling/shelter records. Current enrollment, attendance, outcomes, TVET offerings, disability access and condition data were not found at constituency level.
  • The constituency would benefit from direct education-to-work pathways in agriculture, construction, water operations and hospitality, but this is a policy inference rather than a documented current programme.
Health

Care and service access

  • An official notice confirms Ti-Rocher Micoud Wellness Centre as an operating primary-care facility: it was temporarily closed through 15 August 2025 for deep cleaning, with regular services scheduled to resume 18 August; patients were redirected to Micoud Wellness Centre and home visits continued. This historical notice does not imply the centre remains closed. Current hours, staffing and service-performance data were not found.
  • Water unreliability, flooding and sargassum are plausible health stressors through hygiene, mosquito breeding, injury/access disruption and air-quality effects; local burden has not been quantified.
Safety

Public safety and emergencies

  • Overland flow from hills historically flooded Desruisseaux, Blanchard, Anse Ger and Ti Rocher; new drains were designed around a 1-in-25-year rainfall event, but residual and future-climate risk remains.
  • Community-centre management and maintenance were identified as prior failure points at Blanchard, making governance part of emergency-shelter safety.
  • No constituency-level crime, domestic violence, road-crash, fire or emergency-response dataset was found.
Climate and environment

Hazards, coast and resilience

  • Intense-rainfall overland flow, blocked/undersized local drains, river flooding, erosion and slope instability threaten homes, farms and roads despite completed drainage works.
  • Micoud's water system is vulnerable to drought, turbidity, sedimentation, storms, inadequate storage, grid interruption and non-revenue water; the Re-Water concept proposes resilience upgrades but is not yet verified as a funded implementation project.
  • Sargassum is a documented southeast-coast hazard from Praslin to Vieux Fort, affecting fisheries, tourism, health and livelihoods; constituency-specific exposure sites and cleanup performance are not published.
  • The Ministry's Region 4 agricultural profile spans Praslin River to Canelles River across both Micoud seats. It reports a distinct February-May dry period, greater coastal dry-spell exposure and recurrent scarring of the farming landscape from floods, storms and hurricanes during June-November.
  • Fast land development and prospective resort construction increase the importance of watershed, wastewater, coastal-hazard and cumulative-impact controls.

Ideas to test locally in Micoud South.

These are SLPA proposals for discussion and local validation. They are not an official plan, ranked mandate or finding about what residents want.

  1. 01

    A funded, completed and transparently monitored Micoud water upgrade with storage, resilient energy, turbidity control, watershed work and loss reduction.

    SLPA synthesis

    Water is a prerequisite for housing, farms, health, education, tourism and local industry.

    S052Adaptation Fund BoardS053Adaptation Fund Board
  2. 02

    A preventive drainage/culvert maintenance programme with community reporting and updated climate design checks.

    SLPA synthesis

    Completed drains reduce risk only while clear, connected and adequate for changing rainfall.

    S023World BankS045Government of Saint Lucia /
  3. 03

    Binding local-benefit plans for major developments: job targets, paid training, local procurement, infrastructure contributions and public milestones.

    SLPA synthesis

    Investment interest is real, but local economic outcomes and delivery status are not transparent.

    S048Government of Saint Lucia / S049Government of Saint Lucia / S050Citizenship by Investment UnS051St. Lucia Times
  4. 04

    Completion and sustainable operation of Blanchard Community Centre with a funded management plan and year-round programmes.

    SLPA synthesis

    The prior facility failed partly through management/maintenance, and the replacement's final status is unclear.

    S046Government of Saint Lucia / S047Government of Saint Lucia /
  5. 05

    Agricultural aggregation, irrigation, feeder-road logistics, agro-processing and market contracts, with deliberate inclusion of women and youth.

    SLPA synthesis

    Agriculture is a district asset while female unemployment remains high.

    S004CSOS014CSO
Existing assets and reported action

What the current evidence says is in place

  • Drainage delivery is documented with package count, length and beneficiary outputs, and the national highway/culvert component was completed.
  • The Re-Water proposal recognizes operations, storage, renewable backup, real-time monitoring, non-revenue water, source resilience and accessible emergency water: not only treatment-plant capacity.
  • The Blanchard design incorporated accessibility, rainwater harvesting, emergency shelter and mixed community uses, and its planning explicitly acknowledged the need for stakeholder management.
Questions to check locally

Open questions for local checking

  • Local procurement, apprenticeships and durable resident jobs may be neglected when land/resort projects are assessed mainly by investment or lots sold.
  • Community-facility governance, maintenance financing and year-round programming may be as important as finishing the Blanchard building.
  • Cumulative drainage, wastewater, water-demand and coastal impacts of multiple developments may not be visible in project-by-project reporting.
Open 5 testable policy questions
  1. Hypothesis

    Water-system capacity and reliability are the binding constraints on Micoud South's next phase of housing, agriculture and hospitality growth.

    How to check: Audit denied/delayed connections, outage hours, demand forecasts and firm/farm losses; model benefits under staged upgrades.
  2. Hypothesis

    Local job and procurement covenants would convert Beauchamp/Canelles investment into broader household gains more reliably than project approval alone.

    How to check: Publish contractor workforce/residency, apprenticeships, wages and local spend quarterly; compare with agreed targets.
  3. Hypothesis

    A public drain and culvert maintenance map would prevent more household disruption per dollar than another isolated drainage package.

    How to check: Track blockage/cleaning, rainfall, road closure and flood-claim data by segment over two wet seasons.
  4. Hypothesis

    Blanchard Community Centre can become a high-value resilience and skills hub only under a transparent local operating model.

    How to check: Verify completion; establish a board, operating budget, booking policy and programme calendar; publish usage and cost recovery.
  5. Hypothesis

    An agriculture aggregation/processing corridor linked to the improved highway could diversify income and reduce post-harvest loss.

    How to check: Map volumes, losses, buyers and travel costs; pilot shared grading/processing and contracted sales with farmer-level net-income tracking.

Current stage of projects and commitments.

Status reflects the latest clear source in this research base. “Planned,” “under way” and “operating” are different claims.

Project stageDelivered or operatingA source reports that the project opened, was handed over or is operating.Open 2 recordsClose 2 records
2022-11-30

Micoud drainage programme

Latest sourced status: complete

Twenty-two packages, 4,048 metres of drains and 853 direct beneficiaries; works addressed Desruisseaux, Blanchard, Anse Ger and Ti Rocher flood-prone areas.

S023World BankS045Government of Saint Lucia /
2022-11-30

Micoud/Canelles national-highway and culvert works

Latest sourced status: complete

World Bank project output; reported commuter beneficiaries are not constituency population.

S023World Bank
Project stageIn progressA current source shows construction, procurement, commissioning or another active delivery step.Open 1 recordClose 1 record
2020-09-17

Beauchamp Land Development Project

Latest sourced status: serviced-lot sales commenced; current build-out unresolved

Invest Saint Lucia announced 59 residential/commercial serviced lots at EC$12 per square foot, with about 80% sold at the time and park/field amenities announced.

S048Government of Saint Lucia /
Project stagePlanned or fundedFunding, a budget line or an announced plan exists, but delivery is not yet established.Open 2 recordsClose 2 records
2026-08-11

Saint Lucia Canelles Resort

Latest sourced status: approved/listed; completion and operation not verified

Government said construction began in 2019 and cited a developer-projected end-2025 completion in May 2024; the CIP Unit still lists the project, while January 2025 media reported public dispute about slow progress. No authoritative opening announcement was found.

S049Government of Saint Lucia / S050Citizenship by Investment UnS051St. Lucia Times
2025-10-22

Re-Water Saint Lucia / Micoud water-system resilience

Latest sourced status: concept endorsed; full proposal requested; not verified funded or implemented

Adaptation Fund Board endorsed a US$9,992,305 concept but asked CCCCC/Saint Lucia for a fully developed proposal with more detail, gender plan, cost-effectiveness analysis, consultations and risk work.

S052Adaptation Fund BoardS053Adaptation Fund Board
Project stageStatus needs checkingThe latest public source does not establish the current stage clearly enough.Open 1 recordClose 1 record
National programmes relevant to this areaNational envelopes are not local allocationsOpen 3 recordsClose records

These programmes apply across Saint Lucia. The amounts below are national 2026/27 budget envelopes; this research base does not establish how much is allocated to or spent in Micoud South.

National programme

Community Development Programme

National envelope · EC$20,879,136

Budgeted in 2026/27 Estimates; no constituency split supplied in this dataset

S006Government of Saint Lucia, M
National programme

Community Tourism Programme

National envelope · EC$3,000,000

Budgeted in 2026/27 Estimates; no constituency split supplied in this dataset

S006Government of Saint Lucia, M
National programme

Tourism Enhancement Programme

National envelope · EC$5,565,900

Budgeted in 2026/27 Estimates; no constituency split supplied in this dataset

S006Government of Saint Lucia, M

Review the findings, sources and missing information.

The notebook keeps sourced facts, institutional context and SLPA analysis visible as different kinds of evidence.

How the evidence labels work
Published fact

A sourced official or primary record

Institutional context

An older or broader institutional source

SLPA synthesis

Analysis that must not be read as an official finding

Hypothesis

A testable question that needs local evidence

Research notesKey numberOpen 7 findingsClose findings
  1. Published factconstituency-specific; provisional

    Household population: 8734; unit: people (2022 census night; geography: Micoud South electoral constituency; scope label: constituency-specific; provisional; notes: Table 7/A.8 reports 8,734, up 19.2% from 7,326 in 2010; the row's sex counts sum to 8,735, so sex counts are omitted.).

    Table 7/A.8 reports 8,734, up 19.2% from 7,326 in 2010; the row's sex counts sum to 8,735, so sex counts are omitted.S004CSO
  2. Published factconstituency-specific; provisional

    Private households: 3232; unit: households (2022 census; geography: Micoud South electoral constituency; scope label: constituency-specific; provisional).

    S004CSO
  3. Published factconstituency-specific

    Land area: 13.17; unit: square miles (2022 census geography; geography: Micoud South electoral constituency; scope label: constituency-specific).

    S004CSO
  4. Published factconstituency-specific

    Official 2025 register: 7,806 published entries. This is an administrative register, not a resident-adult or population count.

    Updated to the Electoral Department’s current official 2025 results surface.S002Electoral Dept.
  5. Published factconstituency-specific

    Official 2025 result: 3,964 ballots cast against 7,806 published register entries; 50.8% published turnout; 53 rejected ballots.

    Updated to the Electoral Department’s current official 2025 results surface.S002Electoral Dept.
  6. Proxyadministrative-district proxy; not constituency-specific

    Unemployment rate: 8.91; unit: percent (2025 annual; geography: Micoud administrative district; scope label: administrative-district proxy; not constituency-specific; notes: Male 6.99%; female 20.04%.).

    Male 6.99%; female 20.04%.S014CSO
  7. Proxyolder administrative-district proxy; not constituency-specific

    Poverty headcount: 31.2; unit: percent (2016; geography: Micoud administrative district; scope label: older administrative-district proxy; not constituency-specific).

    S015CSO
Research notesEconomyOpen 4 findingsClose findings
  1. ProxyMicoud administrative-district and Ministry Region 4 proxy spanning both constituencies

    Agriculture and livestock are core activities in the broader Micoud district, with farms and related transport/input/market services across the rural communities. Constituency output and employment are not separately published.

    S004CSOS057Agriculture, Fisheries, Food
  2. SLPA synthesisproject/community evidence

    Construction, land development and highway-facing commerce are visible growth channels around Beauchamp, Desruisseaux and Canelles. The Beauchamp project marketed serviced residential/commercial lots; current build-out and employment are unknown.

    S048Government of Saint Lucia /
  3. SLPA synthesisproject-specific, status unresolved

    Canelles was approved as a Citizenship by Investment resort project and remains listed by the CIP Unit, but no authoritative opening/completion notice was found. It should be treated as prospective hospitality employment, not an operating major employer.

    S049Government of Saint Lucia / S050Citizenship by Investment UnS051St. Lucia Times
  4. SLPA synthesisfacility evidence and data gap

    Schools, wellness/community facilities, public administration, retail, construction and transport provide local service employment. No current employer register or firm-level employment data were found.

    S013Electoral Department of SainS022Government of Saint Lucia /
Research notesInfrastructure and servicesOpen 5 findingsClose findings
  1. WaterSLPA synthesisMicoud district/system evidence, not Micoud South-only

    Micoud's existing treatment/supply system has documented turbidity shutdowns, drought rationing, inadequate storage, grid dependence and network losses. A nearly US$10 million Re-Water concept was endorsed by the Adaptation Fund Board in October 2025, but the Board requested a fully developed proposal; endorsement is not project funding or implementation.

    S052Adaptation Fund BoardS053Adaptation Fund Board
  2. Roads Transport DrainageSLPA synthesis

    All 22 Micoud drainage packages were recorded complete by November 2022, totalling 4,048 metres and 853 direct beneficiaries, covering flood-prone Desruisseaux, Blanchard, Anse Ger and Ti Rocher areas.

    S023World BankS045Government of Saint Lucia /
  3. Roads Transport DrainageSLPA synthesis

    The Micoud/Canelles national-highway road and culvert works were complete by November 2022. The reported 57,546 figure represents estimated commuters/project users, not constituency residents.

    S023World Bank
  4. Community And EmergencySLPA synthesis

    The 2024-25 shelter list included Ti Rocher, Fond Desruisseaux and Blanchard facilities. Current certified capacity, accessibility and backup utilities require verification.

    S022Government of Saint Lucia /
  5. Community And EmergencySLPA synthesis

    Blanchard Community Centre was designed as a resilient HRDC/emergency shelter with IT, meeting, kitchen and event space. It was 75% complete in November 2022 and slated for completion later in 2023, but no authoritative completion/opening notice was located.

    S023World BankS046Government of Saint Lucia / S047Government of Saint Lucia /
Research notesEducationOpen 2 findingsClose findings
  1. SLPA synthesis

    Anse Ger Secondary, Desruisseaux Combined and Blanchard Combined are key school facilities reflected in official polling/shelter records. Current enrollment, attendance, outcomes, TVET offerings, disability access and condition data were not found at constituency level.

    S013Electoral Department of SainS022Government of Saint Lucia /
  2. SLPA synthesis

    The constituency would benefit from direct education-to-work pathways in agriculture, construction, water operations and hospitality, but this is a policy inference rather than a documented current programme.

    S048Government of Saint Lucia / S049Government of Saint Lucia / S052Adaptation Fund Board
Research notesHealthOpen 2 findingsClose findings
  1. SLPA synthesis

    An official notice confirms Ti-Rocher Micoud Wellness Centre as an operating primary-care facility: it was temporarily closed through 15 August 2025 for deep cleaning, with regular services scheduled to resume 18 August; patients were redirected to Micoud Wellness Centre and home visits continued. This historical notice does not imply the centre remains closed. Current hours, staffing and service-performance data were not found.

    S056Government of Saint Lucia /
  2. SLPA synthesis

    Water unreliability, flooding and sargassum are plausible health stressors through hygiene, mosquito breeding, injury/access disruption and air-quality effects; local burden has not been quantified.

    S041Agriculture, Fisheries, FoodS045Government of Saint Lucia / S052Adaptation Fund Board
Research notesSafetyOpen 3 findingsClose findings
  1. SLPA synthesis

    Overland flow from hills historically flooded Desruisseaux, Blanchard, Anse Ger and Ti Rocher; new drains were designed around a 1-in-25-year rainfall event, but residual and future-climate risk remains.

    S045Government of Saint Lucia /
  2. SLPA synthesis

    Community-centre management and maintenance were identified as prior failure points at Blanchard, making governance part of emergency-shelter safety.

    S046Government of Saint Lucia /
  3. SLPA synthesis

    No constituency-level crime, domestic violence, road-crash, fire or emergency-response dataset was found.

Research notesEnvironment and climateOpen 5 findingsClose findings
  1. SLPA synthesis

    Intense-rainfall overland flow, blocked/undersized local drains, river flooding, erosion and slope instability threaten homes, farms and roads despite completed drainage works.

    S023World BankS045Government of Saint Lucia /
  2. SLPA synthesis

    Micoud's water system is vulnerable to drought, turbidity, sedimentation, storms, inadequate storage, grid interruption and non-revenue water; the Re-Water concept proposes resilience upgrades but is not yet verified as a funded implementation project.

    S052Adaptation Fund BoardS053Adaptation Fund Board
  3. SLPA synthesis

    Sargassum is a documented southeast-coast hazard from Praslin to Vieux Fort, affecting fisheries, tourism, health and livelihoods; constituency-specific exposure sites and cleanup performance are not published.

    S041Agriculture, Fisheries, Food
  4. ProxyMinistry agriculture Region 4 proxy spanning Micoud North and South

    The Ministry's Region 4 agricultural profile spans Praslin River to Canelles River across both Micoud seats. It reports a distinct February-May dry period, greater coastal dry-spell exposure and recurrent scarring of the farming landscape from floods, storms and hurricanes during June-November.

    S057Agriculture, Fisheries, Food
  5. SLPA synthesisanalytical inference

    Fast land development and prospective resort construction increase the importance of watershed, wastewater, coastal-hazard and cumulative-impact controls.

    S048Government of Saint Lucia / S049Government of Saint Lucia / S052Adaptation Fund Board
Research notesStrength / assetOpen 4 findingsClose findings
  1. SLPA synthesis

    Completed drainage and national-highway works provide a designed platform for better flood resilience and connectivity; post-completion flood outcomes and maintenance performance were not verified.

    S023World BankS045Government of Saint Lucia /
  2. SLPA synthesis

    A large and growing 2022 household population, agricultural land base and several sizeable communities provide a domestic market and labour pool.

    S013Electoral Department of SainS004CSOS057Agriculture, Fisheries, Food
  3. SLPA synthesis

    Beauchamp serviced-land development and the proposed Canelles resort signal investor interest and potential construction/hospitality demand, though current delivery and local benefit are not established.

    S048Government of Saint Lucia / S049Government of Saint Lucia / S050Citizenship by Investment Un
  4. SLPA synthesis

    Blanchard's planned multipurpose resilient centre could support training, enterprise, culture and emergency shelter if completed and well managed.

    S046Government of Saint Lucia / S047Government of Saint Lucia /
Research notesWhat is workingOpen 3 findingsClose findings
  1. SLPA synthesis

    Drainage delivery is documented with package count, length and beneficiary outputs, and the national highway/culvert component was completed.

    S023World BankS045Government of Saint Lucia /
  2. SLPA synthesis

    The Re-Water proposal recognizes operations, storage, renewable backup, real-time monitoring, non-revenue water, source resilience and accessible emergency water: not only treatment-plant capacity.

    S052Adaptation Fund Board
  3. SLPA synthesis

    The Blanchard design incorporated accessibility, rainwater harvesting, emergency shelter and mixed community uses, and its planning explicitly acknowledged the need for stakeholder management.

    S046Government of Saint Lucia /
Research notesChallengeOpen 4 findingsClose findings
  1. SLPA synthesisMicoud district/system

    Water capacity and reliability constrain housing, agriculture and business across Micoud; the proposed large upgrade remains at concept-development rather than verified implementation.

    S052Adaptation Fund BoardS053Adaptation Fund Board
  2. SLPA synthesis

    Flood risk persists after construction because drainage requires maintenance and the design standard does not eliminate events above 1-in-25 rainfall or future climate effects.

    S023World BankS045Government of Saint Lucia /
  3. SLPA synthesis

    The wider Micoud district's female unemployment rate was 20.04% in 2025 and its historical poverty headcount was 31.2% in 2016; these are important but non-constituency proxies.

    S014CSOS015CSO
  4. SLPA synthesis

    Major development projects have limited current public milestone information: no verified Blanchard opening, Beauchamp build-out report or Canelles completion/operation notice was found.

    S046Government of Saint Lucia / S047Government of Saint Lucia / S048Government of Saint Lucia / S049Government of Saint Lucia / S050Citizenship by Investment UnS051St. Lucia Times
Research notesPotentially neglected issueOpen 3 findingsClose findings
  1. SLPA synthesis

    Local procurement, apprenticeships and durable resident jobs may be neglected when land/resort projects are assessed mainly by investment or lots sold.

    Public sources describe projects but do not report local job, procurement, wage or training outcomes.S048Government of Saint Lucia / S049Government of Saint Lucia / S051St. Lucia Times
  2. SLPA synthesis

    Community-facility governance, maintenance financing and year-round programming may be as important as finishing the Blanchard building.

    The official project history explicitly links the previous centre's failure to management and maintenance.S046Government of Saint Lucia /
  3. SLPA synthesis

    Cumulative drainage, wastewater, water-demand and coastal impacts of multiple developments may not be visible in project-by-project reporting.

    Separate water, drainage, land and resort sources do not provide a combined infrastructure-capacity assessment.S045Government of Saint Lucia / S048Government of Saint Lucia / S049Government of Saint Lucia / S052Adaptation Fund Board
Open evidence gaps

What we still need to know

Shared research need: Needed to distinguish evidence-backed need from a planning hypothesis and to support map-ready local analysis. Useful next source: Community validation, agency administrative data or constituency-level release.

  1. 01

    Whether a fully developed Re-Water proposal has since been submitted/approved; financing agreement, procurement and construction milestones.

  2. 02

    Authoritative opening/completion and operating status for Blanchard Community Centre.

  3. 03

    Current Beauchamp lot build-out, occupancy, utilities, public amenities, jobs and commercial activity.

  4. 04

    Current Canelles construction, CIP financing, ownership/compliance, infrastructure obligations, local jobs and opening status; allegations in political/media debate require documentary verification.

  5. 05

    Water outage, quality, pressure, storage, non-revenue-water and customer-connection data by community.

  6. 06

    Drain/culvert maintenance and post-completion flood performance.

  7. 07

    Constituency-specific labour, poverty, agriculture, business, health, education, crime and emergency-response data.

  8. 08

    Cumulative water, wastewater, traffic, drainage and coastal impact assessment for current/proposed development.

  9. 09

    Region 4 farm production, irrigation access, extension reach and climate-loss data disaggregated between Micoud South and North.

  10. 10

    Current Ti-Rocher Wellness Centre hours, staffing and performance after the temporary August 2025 deep-cleaning closure/resumption date.

Source register20 records linked to this profileOpen sourcesClose sources
  1. S002
    2025 General Election Results (opens in a new tab)

    Saint Lucia Electoral Department · 2025-12-01

    Official / primary
  2. S041
    Agriculture Ministry deploys new tools to combat sargassum impacts (opens in a new tab)

    Ministry of Agriculture, Fisheries, Food Security and Climate Change · 2025-11-06

    Primary regional response source; does not quantify constituency exposure or results.
    Official / primary
  3. S053
    Decisions of the Forty-Fifth Meeting of the Adaptation Fund Board (opens in a new tab)

    Adaptation Fund Board · 2025-10-22

    Primary multilateral Board decision. Concept endorsement is explicitly not final project approval/funding.
    Official / primary
  4. S006
    Estimates of Revenue and Expenditure 2026/2027 (opens in a new tab)

    Government of Saint Lucia, Ministry of Finance · 2026

    Official / primary
  5. S056
    Further closure of Ti Rocher, Micoud Wellness Centre (opens in a new tab)

    Government of Saint Lucia / Ministry of Health · 2025-08-14

    Primary health notice hosted on an education subdomain; historical closure notice confirms the facility but must not be read as evidence it remains closed.
    Official / primary
  6. S013
    Micoud South (M) Information (opens in a new tab)

    Electoral Department of Saint Lucia

    Primary electoral geography.
    Official / primary
  7. S057
    Region 4 Anse Ger Micoud (opens in a new tab)

    Ministry of Agriculture, Fisheries, Food Security and Sustainable Development

    Primary ministry regional profile. Region 4 is an agricultural service geography, not an electoral constituency; no publication date is displayed.
    Official / primary
  8. S004
    Saint Lucia Provisional Census Report 2022: Release 2 Rev. 2.7 (opens in a new tab)

    Central Statistical Office of Saint Lucia / CARICOM mirror · 2025

    Official / primary
  9. S050
    The Saint Lucia Canelles Resort (opens in a new tab)

    Citizenship by Investment Unit Saint Lucia

    Primary project listing but promotional and not an implementation-status report.
    Official / primary
  10. S014
    Unemployment Rates by District and Sex (Annual) 2010 to 2025 (opens in a new tab)

    Central Statistical Office of Saint Lucia · 2026-04-02

    Current primary labour-force table. The site displays the ambiguous raw date 2/4/2026; normalized here as 2 April 2026 under Saint Lucia's day/month convention while retaining the raw value. Districts are not constituencies.
    Official / primary
  11. S049
    We have no business with Philippe Martinez (opens in a new tab)

    Government of Saint Lucia / Office of the Prime Minister · 2024-05-25

    Primary government statement in a contested political context; completion forecast is attributed to the developer and is not proof of delivery.
    Official / primary
  12. S046
    Blanchard Community Center to be refurbished (opens in a new tab)

    Government of Saint Lucia / Disaster Vulnerability Reduction Project · 2019-11-27

    Primary older project-design source; not completion evidence.
    Institutional / older
  13. S023
    Implementation Status & Results Report: Saint Lucia Disaster Vulnerability Reduction Project (P127226) (opens in a new tab)

    World Bank · 2022-12-15

    Credible institutional implementation report, but later completion/operating status must be separately verified.
    Institutional / older
  14. S048
    ISL begins Beauchamp Land Development Project (opens in a new tab)

    Government of Saint Lucia / Invest Saint Lucia · 2020-09-17

    Primary but old project announcement; current build-out/occupancy unavailable.
    Institutional / older
  15. S045
    Micoud drainage contracts signed (opens in a new tab)

    Government of Saint Lucia / Disaster Vulnerability Reduction Project · 2020-01-20

    Primary older contract/design source; World Bank later verifies completion.
    Institutional / older
  16. S022
    New list of emergency shelters per district for 2024-25 (opens in a new tab)

    Government of Saint Lucia / National Emergency Management Organisation · 2024-06-30

    Primary but supersession/certification must be checked for 2026. Shelter district grouping may not exactly follow electoral boundaries.
    Institutional / older
  17. S052
    Proposal for Saint Lucia: Replicating Resilient Water Supply Systems Project in St. Lucia (Re-Water St. Lucia) (opens in a new tab)

    Adaptation Fund Board · 2025-03-17

    Primary multilateral proposal/review document; diagnostic and proposed outputs are useful, but funding/delivery status must come from Board decisions.
    Institutional / older
  18. S015
    Summary Report: Saint Lucia 2016 National Report of Living Conditions (opens in a new tab)

    Central Statistical Office of Saint Lucia · 2018-12

    Official but old and geographically broader than the constituencies; not a current poverty estimate.
    Institutional / older
  19. S047
    World Bank delegation visits Bexon Community Centre construction site (opens in a new tab)

    Government of Saint Lucia / Disaster Vulnerability Reduction Project · 2023-03-08

    Primary forecast, not completion proof.
    Institutional / older
  20. S051
    Pierre, Chastanet at odds over controversial Canelles resort project (opens in a new tab)

    St. Lucia Times · 2025-01-22

    Reputable local media used only to show unresolved public status/contestation; allegations require primary documentary verification.
    Specialist / community