Electricity / A practical policy guide

Lower electricity bills.
A route for every household.

Cheaper power should reach your bill. And benefiting from solar should not depend on owning a roof—or having money for panels.

The recommendation

Start with homes. Procure power at a fair price. Make the savings visible.

2027

Begin where savings can arrive soonest

Fund a measured efficiency pilot, publish the billing rules and design support that people without credit can use.

≈ EC$2

Additional monthly relief through the tariff

Central 2029 scenario for a 200 kWh home. Existing announced projects are already in the comparison baseline.

≈ EC$39

A funded household package could do more

Efficiency plus shared credits and the tariff change. Proposed grants are not secured. This is not a universal tariff cut.

These are investment scenarios, not predictions of future oil prices or promises of benefits. New construction must cover its finance, maintenance and grid costs before there is a saving to distribute.

See the difference

What could change on your bill?

Choose a household-use band and a policy path. The result separates a lower electricity charge from funded support. No personal information is needed.

Choose a household example

These scenarios compare a proposed package with a baseline that already includes announced projects. They are not forecasts of your next bill.

Find kWh used on your bill. This is electricity use, not the dollar amount.
Delivery horizon
How would the household benefit?
Generation-side fuel cost, not the retail tariff or surcharge. The bill reference stays fixed to isolate project economics.

2029 · 200 kWh before changes

Modelled monthly saving

EC$2.11

0.9% lower than the same-price, existing-project baseline.

This benefit is available through the tariff in the scenario. The much larger supported-household figure includes targeted, publicly or donor-funded assistance.

Less electricity usedNo efficiency upgrade assumed
EC$0.00
Shared-solar creditNo targeted credit assumed
EC$0.00
System-wide charge changeApplied to the remaining 200 kWh
EC$2.11
Existing-project baselineEC$246.40
With the proposed packageEC$244.29

Illustrative bills, not future quotes. Uses provisional October 2026 rates from a secondary source. Arrears and account-specific charges are excluded. International oil prices and other costs can change actual bills.

How this calculation works

Start with the provisional October 2026 illustration: EC$0.812/kWh for the first 180 kWh, EC$0.862 above that, plus EC$0.415/kWh fuel surcharge. Add the modelled effect of the already announced Troumassee project to form the comparison baseline. That existing project is not counted again as a new saving.

For the supported example, first subtract 15 kWh. Apply the new system-wide charge reduction only to electricity still used, then subtract the net shared-solar credit. This avoids counting a tariff saving on electricity the household no longer buys. Grid-cost recovery is included in the national model.

The shared-project example serves 5,000 households from 2 MW of generation: EC$12 million capital, an 80% grant and 20% debt at 4% over 20 years. Credits depend on actual output and revenue; they are not guaranteed payments. The 2033 scenario includes solar degradation.

A verified historical comparison: at the official 2025 annual-average rates, 200 kWh cost about EC$163.60 before account-specific adjustments. Saving 15 kWh would avoid about EC$12.94. This separate benchmark is not a recalculated 2029 or 2033 package.

The national average calculated from 2025 domestic sales was approximately 193 kWh/month. Consumption does not establish poverty, eligibility or essential medical needs. A measured home assessment must establish whether a 15 kWh saving is realistic.

Figures are in constant 2026 EC dollars. Construction prices, finance, grid capacity, output and legal tariff arrangements must be confirmed before commitments. Changing the avoided-fuel selector tests only that model assumption; it does not simulate the resulting movement in retail fuel charges.

Read the evidence and assumptions ↓

Why start at 200 kWh?

Official 2025 figures show 154.9 million kWh sold to about 66,913 domestic accounts: roughly 193 kWh per account per month. The average does not tell us who is poor, who rents, or who needs electricity for medical equipment.[1]

What is already in the comparison?

The announced 10 MW Troumassee solar project and its battery are included in the model’s baseline. The savings above are from additional measures. We do not count the same project twice.[3][15]

Access without ownership

No panels. No deposit. A real route to benefit.

A renter should not have to buy a roof to benefit from cleaner power. The proposed programme puts the equipment, borrowing and maintenance obligations with the project owner.

SLPA proposal · funding not secured

Put the credit on the account.
Keep debt off the household.

Start with a transparent target of 5,000 households. Use public roofs or suitable shared sites, competitively selected operators and an independently checked beneficiary register.

Prioritise financial hardship, renters, unsuitable roofs and lack of access to credit. Do not use low consumption alone as the test: disability, medical needs and a larger household can mean higher essential use.

A household that cannot safely reduce consumption should still be able to receive a funded credit. Nobody should cut food refrigeration, safe cooling or essential medical use to make the numbers work.

  1. Fund it

    Finance and donors secure grants, operating support and consumer protections before enrolment promises.

  2. Install where it works

    Audit eligible homes for inexpensive efficiency improvements. Put shared panels on structurally suitable sites with grid approval.

  3. Pay the real costs

    The project pays maintenance, administration, insurance, debt and reserves. Publish the remaining credit pool.

  4. Credit and verify

    Apply credits through LUCELEC’s billing system. Show every programme charge, the amount received and the complaint route.

If you rent

No roof ownership requirement. Obtain consent for fixed home upgrades. Use written landlord agreements so higher rent or electricity mark-ups do not swallow the public benefit.

If you move

Make eligibility portable within Saint Lucia. Transfer the credit to the verified new account; provide a process for shared meters and accounts held in another person’s name.

If money is already tight

No household loan, home lien or conventional credit test in the targeted grant programme. Publish appeals and simple offline enrolment alongside any digital option.

Who pays—and what happens to customers outside the programme?

The central shared-solar model uses an EC$9.6m capital grant and EC$2.4m project loan. An 80% grant transfers costs to donors or the public budget; it does not make the equipment free to society. After costs and reserves, the model credit is EC$18.32 a month for each of 5,000 households. Without the grant it is EC$6.55.

The example generates 3.4 million kWh a year, sold at an assumed EC$0.515/kWh: EC$1.751m in revenue. Deduct EC$300,000 in operating and administration costs, about EC$176,600 in debt payments, and a 10% revenue reserve of EC$175,100. The remaining EC$1.099m provides about EC$18.32 monthly for 5,000 households.

Efficiency also reduces utility revenue that supports continuing grid costs. The calculation recovers that contribution before reporting universal savings. We recommend an explicit, temporary budget payment to protect nonparticipants during the initial efficiency rollout. The first full-year cash envelope is about EC$3.26m: EC$2.5m equipment, EC$0.10m upkeep and EC$0.66m transition support.

Would shared solar keep my lights on during an outage?

Shared solar distributes financial benefits. It does not automatically keep individual homes powered when a line fails. A microgrid needs batteries, protective equipment, controls and a safe way to disconnect from the main grid.

Prioritise that extra resilience cost at clinics, shelters, water pumps and other critical services. An illustrative EC$1m microgrid addition, annualised at 6% over 15 years plus EC$20,000 upkeep, costs about EC$123,000 a year—roughly EC$20.49 a month if divided among 500 households. That cost needs a separate resilience justification and funding source.

The investment choices

Buy results, not just megawatts.

Rank options by their complete local cost, delivery risk and benefit to customers. The estimates below are planning allowances in 2026 EC dollars, not supplier quotations. Individual benefits cannot simply be added together.

01

First priority

Screened home efficiency

Proposed grant-funded programme
EC$2.5m5,000 homes · EC$100,000 annual upkeep

Audit first. Fix avoidable waste in lighting, fans, refrigeration and controls. Replace an appliance only when its measured savings justify the cost. Many very low-use homes need direct support instead.

About EC$12–19/month for a home saving 15 kWh

First bills: Q2 2027. Verify savings before scaling. At low fuel prices, the 15 kWh package needs a cost near EC$360 or better savings to pass the resource-cost test.

02

Best scalable generation candidate

Additional utility solar

New proposal · separate from Troumassee
EC$54m10 MWac · EC$1.08m annual operating allowance

In the central first-year screen, 20 GWh of output avoids EC$10.3m in fuel and variable costs. After annualised capital and operating costs, about EC$5m remains. Spread across all electricity sold, the individual saving is modest.

About EC$2.21/month at 200 kWh, on its own

Credible target: Q3 2029. Competitive price, land, grid capacity and an enforceable pass-through rule. Add any extra storage the grid study requires before comparing costs.

03

A route without a private roof

Shared solar and public roofs

Proposed · grants not secured
EC$12m2 MW · EC$300,000 annual operations and administration

Sell output at its avoided system value. Pay maintenance, administration, debt and reserves, then distribute the remaining cash as bill credits. The central model needs EC$9.6m in grants and EC$2.4m in project debt.

EC$18.32/month credit for 5,000 households centrally

Phased credits: 2028–29. Secure the grant before promising credits. Without it, the same model delivers about EC$6.55/month. The project—not the household—borrows.

04

Measure the opportunity

Targeted grid loss reduction

Conditional new investment
EC$8mFeeder improvements · EC$160,000 annual upkeep

The screen cuts the assumed network loss rate from 5.3% to 4.8%. Transformer, conductor, voltage and phase-balancing work should be selected using real feeder measurements.

About EC$0.19/month at 200 kWh, on its own

2028–29. Check overlap with financed grid projects. Station electricity use, debt collection and physical network losses are different things.

Keep these options behind clear evidence gates

Batteries: buy a defined grid or backup service

Storage uses electricity and loses some of it. It can still be worthwhile if it avoids curtailment, reduces costly reserve requirements, defers capacity or protects essential services. Size it from hourly dispatch and stability studies.

The model allows about EC$1.43m per usable MWh for an installed system, not a battery pack. Specify power, usable energy, reserve allocation, hurricane and corrosion protection, augmentation, fire safety and recycling. Troumassee’s tender includes reserve and voltage/frequency functions; its final price and operating benefits must be verified.[15][25]

Rooftop solar and leases: count repayments, exports and repairs

A model 3 kW system costs EC$20,250. For a 300 kWh home using 40% of production onsite, a ten-year loan at 8%, EC$400 yearly upkeep and an assumed EC$0.45 export rate leave about EC$31 a month at the provisional October tariff benchmark. With no fuel surcharge, that net benefit becomes about minus EC$35. With no export payment, it is about minus EC$77.

These export and loan rates are scenarios, not current entitlements or lender offers. Before signing, get the full installed price, total repayments or lease charges, fees, insurance, roof responsibilities, inverter replacement and exit terms. Check the written export arrangement and outage capability. A smaller system matched to daytime use may be safer.[23][38]

Wind and geothermal: measure the resource before the commitment

Wind needs site measurements, hurricane design, transport access and a competitive delivered price. A planning screen at US$3,500/kW needs about a 25% net capacity factor simply to match EC$0.50/kWh before extra integration costs. A regional benchmark is not a local offer.

Geothermal exploration is already funded; a power station is not. The July 2026 tender seeks three exploratory wells. A commercial plant in 2031–33 is conditional on successful exploration, sustainable output, environmental approvals, financing and price. A later date—or no commercial project—is plausible. The tender’s closure does not establish an award or completed drilling.[17][18]

Electric vehicles, shore power and LNG: who carries the risk?

New electricity sales can help pay existing grid costs if the customer covers the infrastructure and does not force expensive new peak capacity. In the screen, 5 GWh of managed EV charging contributes about EC$1.14m a year after dedicated infrastructure, worth roughly EC$0.50 a month at 200 kWh. This is an uptake scenario, not a forecast.

Shore power only passes the illustrative cost test at around 10 GWh a year. At 20 GWh it helps; at 5 GWh it loses nearly EC$2m annually. Require port and cruise-company commitments rather than putting unused assets on household bills. The regional memorandum is exploratory.[30]

LUCELEC also describes a 30 MW LNG replacement plan. Compare full delivered gas, landing and storage infrastructure, take-or-pay obligations, storm exposure and alternative firm supply. None of these unproven demand or fuel options is added to the headline savings.[3]

A conditional investment envelope

EC$76.5m through 2029

Additional utility solar, shared solar, targeted grid work and efficiency. A later solar-and-storage tranche raises cumulative new investment to about EC$213m by 2033. These amounts exclude existing commitments. Approve each tranche only if the updated cost and reliability tests pass.

Delivery, not announcements

When could the saving reach a bill?

Approval, financing, construction and a working billing rule are separate milestones. A project produces no saving during a year in which commissioning is delayed.

2027

First 12 months · SLPA proposal

Start with homes and the rules

Finance, Equity and the energy ministry: approve pilot funding and eligibility in Q1; procure and begin 500 home upgrades in Q2; expand toward 5,000 by October only if measured results and staffing support it.

Attorney General, government and NURC: publish the legal-status and tariff pack, consult on cost reconciliation and test the billing changes.

First lower bill: the cycle after an effective home upgrade. Delayed rollout: 2028.

2028–29

Existing projects + new proposals

Deliver power and credits together

LUCELEC: targets Q2 2028 for Troumassee, an existing 10 MW solar and 26.6 MWh battery project. Confirm the award, finance, total cost and dispatch case.[3][15]

Programme owner, Finance and NURC: secure shared-project sites, credit rules and funding in 2027–28; phase installation and credits in 2028–29. LUCELEC or competitively selected producers: target Q3 2029 for additional solar after grid and cost tests.

First credit: one or two billing cycles after tested commissioning and a lawful billing arrangement. Land, finance or procurement delays can move delivery to 2030–31.

2030–33

Conditional expansion

Scale what proves worthwhile

Energy ministry, NURC and LUCELEC: refresh the resource plan with measured demand, dispatch and resource results. Procure later solar and flexibility in stages. Consider viable wind or geothermal on the same full-cost basis.

Do not buy oversized storage to meet a capacity headline. Do not commit to a power plant on the strength of exploratory drilling alone.

First benefit: after commissioning and tariff reconciliation. A 2034+ date—or cancellation—is preferable to locking customers into an uneconomic project.

What funding exists, and what still needs to be raised?

The July 2025 RREIIF agreement provides a signed US$29.1m IDA credit for eligible electricity infrastructure. It is repayable finance, not a free household grant. Associated concessional lending and grants have defined purposes and conditions. Check the approved workplan before counting proposed grid investments again.[19]

SLDB’s Green Climate Fund accreditation creates a route to seek finance; it is not an award for this programme. A new climate-finance proposal needs feasibility, safeguards, country approval, financial design and monitoring. Allow 18–36 months or longer rather than depending on it for the first pilot.[29]

Fund the first efficiency pilot through a clear budget or specific donor award. Use competitive utility or independent-producer finance for generation, and publish which construction, performance, fuel and demand risks investors or customers bear.

The link between a project and a bill

Make net savings a billing obligation.

A solar farm can save diesel without every dollar reaching customers. The tariff must account for both the fuel no longer bought and the new system costs.

01 / Avoided costFuel + variable operations
02 / Added costProject + finance + grid
03 / Net resultPotential customer saving

The fuel surcharge is only part of the story

The published legacy formula uses gallons consumed, multiplied by the difference between current and base fuel prices, divided by units sold. That price-difference formula does not automatically return the entire avoided fuel cost. Base-rate and purchased-power costs also need reconciliation.[5]

Publish a monthly energy-cost ledger and an independently audited annual adjustment. Show the customer credit after efficient new costs and allowed returns, rather than promising to pass through gross fuel savings.

Reliable service has to remain funded

Lines, backup supply, maintenance and storm recovery still cost money when some customers buy fewer units. Recover efficient grid costs fairly and protect essential use. Grants should reduce the costs charged to customers; they should not earn a second return as if privately financed.

Reward verified efficiency and reliable service. Set a limited, explicit performance incentive if needed, and show how any retained utility share reduces the customer saving. The central model assumes full pass-through of net savings.

01

Clear entry and connection rules

NURC, government and LUCELEC should publish licence tiers, application fees, decision deadlines, hosting capacity and reasons for refusal. Specify export limits, smart-inverter settings, metering and an appeal route. Existing renewable licensing powers provide a starting point; the new Act’s legal transition needs confirmation.[7][10][23]

02

Competitive contracts with a price test

Compare delivered energy and required flexibility. Publish tender criteria, the accepted price, performance guarantees and allocation of curtailment and fuel risks. NURC should scrutinise efficient cost recovery; government must ensure the necessary authority and instruments are in place.[8][11]

03

Fair self-use, export and time-of-use pricing

Self-use avoids the applicable retail charge. Exports should earn their measured system value, accounting for time and integration costs. Pilot opt-in time-of-use rates with bill protection and understandable meters; do not make households with inflexible essential loads pay for savings they cannot access.[38]

04

A lawful route for credits and protection

Government funds social obligations; NURC sets or approves rules within its lawful powers; LUCELEC implements and tests billing. The published legacy Act contains ministerial powers to amend tariff schedules, including Schedule 2. Shared offsite credits still need explicit administrative and legal arrangements.[6][9][37]

Legal status matters: LUCELEC reported passage of a new Electricity Act in September 2026 and awaited supporting regulations. The final assented text and commencement were not independently verified. A draft grid code is not evidence of rules in force. Confirm the operative instruments before treating a proposed right or regulatory power as available.[3][12]

The public scorecard

Count the benefit people receive.

A falling oil price can reduce bills without any reform. A reform can save money even while an oil shock raises the actual bill. Publish both the real bill and a fair comparison.

01

Household bills

Monthly kWh, charges, credits and arrears. Compare like-for-like fuel prices and weather-adjusted usage with similar homes.

Lead: LUCELEC + independent evaluator
02

Fuel and total costs

Litres used, net renewable output, storage losses, curtailment, financing and purchased power. Reconcile these to the credit.

Lead: LUCELEC + NURC
03

Reliability

Outage duration and frequency, voltage complaints, reserve performance and critical-site tests. Show storm impacts separately and in total.

Lead: LUCELEC + NURC
04

Who benefits

Net amounts reaching renters, low-income homes, people without credit and households with higher essential needs, by district.

Lead: Equity + programme owner
05

Money and delivery

Grants, debt, reserves, change orders, commissioning and the first credited bill. Protect household identities in public reporting.

Lead: Finance + independent auditor

Our test

Build cheaper power.
Make the savings visible.
Include people without capital.

Useful now

A question about your bill today?

The investment programme above is a proposal. These steps help you understand or challenge an existing bill.

  1. Separate use from price.

    Compare kWh, billing days, meter readings and the fuel adjustment with earlier bills. Check arrears and adjustments separately. A minimum bill is a floor, not an extra flat charge on every account.

  2. Ask LUCELEC for an explanation.

    Keep copies of bills, meter details, correspondence and the complaint reference. If payment is difficult, ask what arrangements are currently available; do not assume a public discussion creates an approved benefit.[13]

    LUCELEC contact information ↗
  3. Escalate an unresolved complaint.

    NURC’s procedure asks consumers to exhaust the utility’s complaint process first and provide supporting evidence. It accepts contact beyond an online form.[40]

    Read NURC’s complaints procedure ↗

Before buying equipment, ask for the total price and repayments, a realistic output estimate, all ongoing charges, the written export arrangement and what happens if tariffs fall. Do not sign a loan or lease based only on an advertised gross saving.

Open the workings

Evidence, assumptions and decisions still open.

Observed figures, sponsor targets and SLPA scenarios answer different questions. The guide keeps them separate and links the evidence below.

Observed: reported resultsTarget: intended deliveryScenario: conditional calculation
How the household savings are calculated

The provisional October reference is EC$0.812/kWh for the first 180 kWh and EC$0.862 thereafter, plus EC$0.415/kWh fuel adjustment. A 200 kWh example is EC$246.40. Direct access to the utility rate sheet was unavailable; this is secondary evidence, not a certified current quote. The official 2025 annual-average benchmark is EC$0.813/0.863, giving EC$163.60 at 200 kWh. No VAT uplift is added: the VAT Act zero-rates LUCELEC electricity.[1][4][35]

Start with the committed-project comparison bill. For the supported path, remove 15 kWh, apply the net additional tariff change to the remaining consumption, then deduct the shared-project credit. Recover the utility’s continuing-cost contribution in the system model. This avoids counting the same saved electricity twice.

The central model assumes 2% annual sales growth, EC$0.50/kWh avoided fuel plus EC$0.015 variable operations, a 6% resource discount rate, 25-year solar life and 0.5% annual solar degradation. Shared-project cash debt is modelled separately at 4% over 20 years. All project costs are planning assumptions in constant 2026 EC dollars.

What could make savings smaller—or turn them into a cost?

At 200 kWh, the central incremental universal saving is EC$2.11/month in 2029 and EC$3.60 in 2033. With fuel at EC$0.35/kWh, it falls to about EC$0.55 and approximately zero. Expensive finance, cost overruns, lower output and battery replacement can make a package uneconomic.

The combined downside—low fuel prices, 10% financing, 25% higher generation capital costs, 15% lower output and higher battery lifecycle cost—raises modelled system charges. That is a reason to reject, resize or reprice an investment, not a cost to hide. Low output and a smaller grant also cut shared credits. No later project should be treated as an automatic commitment.

What must be published before large commitments?
  • The dated tariff sheet, final Electricity Act, commencement and implementing instruments.
  • Current audited fuel accounts and the monthly fuel, sales and purchased-power ledger.
  • Troumassee’s final price, financing, augmentation costs and dispatch case.
  • Hourly demand, generation efficiency, reserve needs, hosting capacity and curtailment studies.
  • Measured household savings, current local quotations and confirmed grant allocations.
  • Resource tests and full commercial terms for geothermal, wind, LNG or shore power.
How this develops SLPA’s earlier energy work

The Energy Sovereignty & Local Ownership Compact sets the broader direction: less imported fuel, resilient services and local participation. This guide adds the household bill calculation, a route for people without capital and a stricter test for each increment of storage or generation.

Read this alongside the household recovery analysis, water service and affordability work and Soufrière’s geothermal context. Lower electricity costs, reliable water pumping and household resilience are connected, but each needs its own measured result.

Source register · primary records and evidence limits
  1. [1]
    Economic and Social Review 2025 ↗

    Government of Saint Lucia Ministry of Finance · 2026; exact publication day not established

    Primary; 2025 preliminary results, printed pp48-49 and116-118. Electricity data supplied by LUCELEC.
  2. [2]
    Annual Report 2024 ↗

    LUCELEC · Published 2025

    Primary audited report; printed pp7-8,34,56,114-115,120-121. Latest full annual report directly inspected, not proof no later report exists.
  3. [3]
    Directors report for six months ended 30 June 2026 ↗

    LUCELEC · Published in Weekend Voice 19 September 2026 p7

    Primary-authored unaudited issuer report on a newspaper host. Includes pipeline and legal-transition statements.
  4. [4]
    Eastern Caribbean rates and grid codes ↗

    XenogyRE · Current page retrieved 30 October 2026

    Secondary only. October domestic rates used provisionally; linked utility rate sheet inaccessible. Not legal authority.
  5. [5]
    Electricity Supply Act Schedule 2 ↗

    Attorney General Chambers · Revised Laws 2023; amendments through 2016

    Primary statutory fuel-surcharge formula; subject to verification of any 2026 supersession.
  6. [6]
    Electricity Supply Act section 30 ↗

    Attorney General Chambers · Revised Laws 2023

    Primary interim return/rate adjustment and protected consumer allocation authority.
  7. [7]
    Electricity Supply Act section 4 and Act history ↗

    Attorney General Chambers · 2016 amendments; Revised Laws 2023

    Primary renewable-generation licensing authority. History: https://attorneygeneralchambers.com/laws-of-saint-lucia/electricity-supply-act/act
  8. [8]
    Electricity Supply Act section 35 ↗

    Attorney General Chambers · Revised Laws 2023

    Primary performance monitoring and rate-review provisions.
  9. [9]
    Electricity Supply Act section 36 ↗

    Attorney General Chambers · Revised Laws 2023

    Primary Schedule 1 amendment power.
  10. [10]
    Electricity Supply Act section 64 ↗

    Attorney General Chambers · Revised Laws 2023

    Primary regulation-making power, including renewable licensing, fees and tariffs.
  11. [11]
    National Utilities Regulatory Commission Act section 6 ↗

    Attorney General Chambers · Act 3 of 2016; Revised Laws 2023

    Primary NURC functions; powers operate within relevant Regulatory Acts.
  12. [12]
    Draft Electricity Grid Code Regulations ↗

    Government of Saint Lucia · Draft 2024 instrument with blank enactment fields

    Primary draft; not verified as operative law. Acts index checked: https://npc.govt.lc/laws/acts/2026 ; incomplete listing cannot prove non-enactment.
  13. [13]
    Statement on Electricity Costs and Government Support ↗

    Office of the Prime Minister · 26 October 2026

    Primary current relief discussion; no approved disconnection pause or eligibility programme established by the release.
  14. [14]
    Saint Lucia 2022 Population and Housing Census Provisional Results ↗

    Central Statistics Office · 2022 census; release PDF hosted November 2025, exact publication day unclear

    Primary statistical tables: tenure p28, appliances B20/B21 p78. Provisional households, not 2026 utility-account counts.
  15. [15]
    Troumassee EPC instruction to tenderers ↗

    LUCELEC and ESB International · 10 November 2025

    Primary procurement specifications; pp6-7,14-16,22-25,34-35. Notice: https://www.lucelec.com/content/rfp-troumassee-10mwac-solar-pv-133mw266mwh-bess-and-substation-project
  16. [17]
    RESDP Implementation Status and Results Report P161316 ↗

    World Bank · 11 December 2025

    Primary exploration and technical-assistance component finance, US$33.616m; no generating-plant commitment.
  17. [18]
    Integrated drilling services tender ↗

    Saint Lucia RESDP and Ministry of Finance · 28 July 2026; revised closing date 7 October 2026

    Primary procurement notice for three exploratory wells, not construction of a power station. Tender closure does not establish an award or completed drilling.
  18. [19]
    IDA 7750-LC RREIIF Financing Agreement ↗

    World Bank and Saint Lucia · Saint Lucia signature 16 July 2025

    Primary signed US$29.1m credit; companion finance described as intended in agreement; scope, charges, repayment and conditions.
  19. [23]
    Amended Solar PV Application Form ↗

    NURC · File uploaded November 2025; printed version date unclear

    Primary application requirements, fees, owner/nonowner documents and equipment certifications; not offsite credit authorization.
  20. [25]
    Grenada Battery Storage System Project procurement ↗

    Caribbean Development Bank · Bid deadline 23 October 2026

    Primary 5.5 MW /11 MWh scope and US$8.7m financing envelope. Not awarded EPC price.
  21. [29]
    Accredited entity profile and accreditation announcement ↗

    Green Climate Fund / SLDB · Accreditation approved 1 July 2025; SLDB release 2 July 2025

    Primary access route, not award: https://www.sldb.lc/saint-lucia-development-bank-sldb-achieves-green-climate-fund-gcf-accreditation
  22. [30]
    Regional shore-power memorandum ↗

    OECS · Signed 24 July 2025

    Primary exploratory partnership; no verified Saint Lucia commercial-scale commissioning or guaranteed demand.
  23. [35]
    Value Added Tax Act Schedule 1 paragraph 2(2)(f) ↗

    Attorney General Chambers · Revised Laws 2023

    Primary zero-rating for LUCELEC electrical energy. Separate from time-limited solar-equipment tax relief.
  24. [37]
    Electricity Supply Act section 67 ↗

    Attorney General Chambers · Revised Laws 2023; amended 2016

    Primary ministerial power to amend Schedules 2,3,4 by Gazette order, subject to 2026 transition verification.
  25. [38]
    Consultation on renewable energy pricing and capacity limits ↗

    NURC · Published 21 April 2023; consultation 6 April

    Primary consultation: then 5 kW residential /25 kW commercial limits and concern about grid-cost recovery. Not a final 2026 tariff determination.
  26. [40]
    Consumer complaints procedure ↗

    National Utilities Regulatory Commission · Undated; checked 31 October 2026

    Current consumer route: exhaust the utility complaint process and provide supporting records before escalation.