ExperimentalProfile format under testing · reviewed 11 August 2026

Electoral constituency P · East

Dennery North

Area covered

An inland and east-coast constituency spanning the Mabouya/Dennery valley settlements north and west of Dennery Village. The legal boundary uses the Louvet River and coast in the north/east, the Barre de L'Isle ridge and Mt La Combe in the west, and the La Ressource/La Pelle/Lumiere corridor toward the Dennery South boundary.

2022 household population
7,000
provisional Census
Private households
2,657
2022 Census
2010–22 reported change
-8.8%
household population
Named community entries
25
official descriptions and polling records

“Household population” is not total resident population. It counts people recorded in private households in the provisional 2022 constituency tables and excludes people outside private households.

Read this number carefully

The official table reports 3,524 male and 3,746 female residents, which does not reconcile to the stated 7,000 household-population total; do not derive a sex ratio from these fields.

How to read this profile

Facts, analysis and open questions are kept separate. A proxy is a stand-in from a different geography. A project announcement is not proof of completion or results. Questions are prompts for local checking, not findings of neglect.

What stands out in Dennery North?

Local economy

What supports work and livelihoods

  • Agriculture and associated transport, input supply and informal trade are a central valley livelihood base. The 2022 census records substantial agricultural land use and livestock in the Dennery administrative district, but does not allocate those figures reliably between North and South.
  • BRACCVAS provides active climate-smart agriculture support in the wider Dennery area: CDB reports a forest nursery producing more than 10,000 plants for erosion control/land restoration, training in GPS/GIS, youth and equity work, and ongoing soil-conservation, rainwater-harvesting and efficient-watering measures. The source does not allocate beneficiaries between Dennery North and South.
  • Public services, schools, health facilities, construction and small retail/service businesses are local employment anchors. The Grande Riviere Digital Development Centre adds a platform for training, coworking and micro-enterprise support.
  • No authoritative current inventory of major private employers, firm employment, farm output or value-chain earnings was found for Dennery North.
Strengths

What this area can build on

  • Major water infrastructure ceremonially commissioned by government, restored primary/dental care and a new digital-development centre create a stronger basic-services platform than existed a decade ago; CDB's continuing 'Under Implementation' label means the water project's overall closure should not be described as complete.
  • Fertile valley land, established farming knowledge, multiple settlements and proximity to the East Coast Road support food production and distributed small enterprise.
  • The land-rationalization programme offers a route from insecure occupation of state land to formal ownership for eligible households in Dennery North and South.
Pressure points

What needs attention

  • High historical poverty and a very large female unemployment rate in the wider Dennery district point to weak household income security and gendered barriers to paid work.
  • Dispersed settlements increase the cost of maintaining feeder roads, drains, public transport, health outreach and school access.
  • Formal land tenure, hazard-safe housing improvement and access to affordable finance remain linked challenges for households covered by land rationalization.

Population, participation, local action and source types.

Household populationProvisional Census comparison
20107,679
20227,000

-8.8% reported change

Official published turnoutPublished-register denominator · constituency and 17-seat median
Dennery North55.0%17-seat median50.5%

4,873 ballots cast against 8,861 published register entries. Register-quality concerns can affect this denominator; do not read the comparison as a resident-adult participation estimate. Why this matters →

Local action tracker9 constituency-linked records in this research base
Delivered or operating2
In progress5
Planned or funded2
Status needs checking0

Status labels organise the record. They do not score performance.

Source types19 records linked on this page
Official / primary
14
Institutional / older
5
Specialist / community
0
Other / needs checking
0

These labels show where each source came from. They do not score whether a project worked.

The communities inside Dennery North.

These names come from official electoral descriptions and polling-place records. A community may cross everyday social or service boundaries.

25 selected place labels

  • Anse PovertP4
  • Au Leon / Aux LyonP5
  • BelmontP3
  • CompareP2
  • De BarraP3
  • Dennery KnobP4
  • Derniere RiviereP3
  • DespinozeP5
  • Du BonairP1
  • DuncanP4
  • Fond PetitP3
  • GadetteP4
  • Grande RavineP2
  • Grande RiviereP1
  • La Belle VieP2
  • La PelleP4
9 additional named entriesOpen listClose list
  • La RessourceP4
  • Mardi GrasP3
  • Morne PanacheP1 · P3
  • Mt La CombeP1
  • RichfondP2
  • ThomazoP1
  • Tou CadetP5
  • TournesseP1
  • Trou HalhalP5

25 of 25 entries carry a polling-district code in this release. A missing code means it was not present in the assembled source rows, not that the place sits outside a polling district.

Boundary resources

Check the official description and reference map.

Dennery North reference map (PDF)Central Statistical Office · map vintage 2010 (opens in a new tab)Current constituency descriptionSaint Lucia Electoral Department · site availability can vary (opens in a new tab)

The CSO PDF is an older official reference map with a 2010 map vintage. It may not show later boundary or coding changes. Use it alongside the current official Electoral Department description when that page is available.

Schools, health, safety and climate information.

These notes identify assets, service gaps and risks. They do not turn the number of notes into a performance score.

Education

Schools, skills and community buildings

  • The constituency has multiple combined/primary and secondary-school facilities reflected in official polling and shelter records, including Grande Riviere Secondary, La Ressource Combined, Richfond Combined, Aux Lyon Combined and Derniere Riviere Combined. Current enrollment, attendance, exam outcomes, special-needs capacity and facility-condition data were not found at constituency level.
  • The new digital centre is a positive education-to-employment asset, but its reach and outcomes require measurement beyond counts of visits or training sessions.
  • The 2024-25 Budget said Grande Riviere Secondary was being transformed into an institute for Sustainable Agriculture, Culinary Arts and Entrepreneurial Services; the Prime Minister's January 2025 address separately reported that a Dennery TVET school was commissioned in September 2024. These sources support an important TVET direction, but do not verify current course delivery, enrollment or graduate outcomes.
  • The 2024-25 Budget listed major repairs for La Ressource Combined and Grande Riviere Secondary. No authoritative completion evidence for those repair packages was found, so they remain commitments rather than completed assets.
Health

Care and service access

  • La Ressource Wellness Centre reopened on 28 February 2025 after a 2015 fire, restoring maternal and child health, chronic-disease, general, mental-health, men's-health, podiatry and other primary services.
  • Dental care was re-established at La Ressource in March 2026 for children and adults in the Dennery Valley.
  • Infrastructure and patient-flow improvements at Richfond Wellness Centre were reported ongoing in July 2025, with climate resilience among the objectives; no subsequent completion notice was located.
Safety

Public safety and emergencies

  • A geographically distributed shelter network is an asset, but current certified capacity, accessibility, backup power/water and transport plans were not available.
  • No constituency-level police-recorded crime, domestic violence, road-crash or emergency-response-time data were found; claims about local crime trends would therefore be speculative.
Climate and environment

Hazards, coast and resilience

  • River-valley and hillside settlements face intense-rainfall runoff, river/culvert flooding, erosion and landslide-related access disruption. The wider Dennery watershed contains dry-forest and riparian conservation priorities.
  • Dennery North's pre-project system faced acute dry-season shortages, rainy-season turbidity, outdated infrastructure and disruption to households and businesses. Major works were ceremonially commissioned in 2020, but no current public continuity or water-quality performance series was found and CDB still labels the project under implementation.

Ideas to test locally in Dennery North.

These are SLPA proposals for discussion and local validation. They are not an official plan, ranked mandate or finding about what residents want.

  1. 01

    A farm-to-market productivity system: dependable feeder roads, drainage, irrigation/storage, extension, aggregation, cold storage and purchase contracts.

    SLPA synthesis

    Agricultural potential alone does not secure earnings when logistics, climate exposure and market access are weak.

    S004CSOS010Electoral Department of Sain
  2. 02

    Public performance reporting for the water system and health facilities, including outages, quality, wait times, staffing, referrals and preventive-care coverage.

    SLPA synthesis

    Capital completion is documented; service quality over time is not.

    S017Govt. of Saint LuciaS018Government of Saint Lucia / S020Government of Saint Lucia /
  3. 03

    Employment pathways attached to the digital centre, with particular attention to women, youth and people with disabilities.

    SLPA synthesis

    The district-level labour data show a pronounced female employment deficit while the centre offers a new delivery platform.

    S014CSOS016Govt. of Saint Lucia
  4. 04

    Hazard-informed land regularization and affordable home upgrading, not title transfer alone.

    SLPA synthesis

    Tenure security should be paired with drainage, slope, access and resilient-building standards.

    S021Government of Saint Lucia / S054Government of Saint Lucia /
Existing assets and reported action

What the current evidence says is in place

  • Basic-service restoration has been unusually concrete: major water works were ceremonially commissioned, La Ressource health services reopened, dental services were restored, and a multipurpose digital centre is operational. CDB's current project-status discrepancy is retained rather than overwritten.
  • The digital centre combines access, training, coworking and e-government rather than treating connectivity as a standalone computer lab.
  • The health-upgrade programme explicitly includes patient flow and climate resilience, which is appropriate for a storm-exposed rural service network.
  • Active BRACCVAS work in the wider Dennery farming area combines erosion-control planting, technical capacity, youth/equity attention and water/soil adaptation rather than a single input distribution.
Questions to check locally

Open questions for local checking

  • Operations and maintenance after capital delivery: water intakes, pumps, drains, feeder roads, shelters and wellness facilities: may receive less attention than construction announcements.
  • Care burdens, transport and flexible training/work arrangements for women may be under-addressed despite the district's 2025 female unemployment rate of 23.02%.
  • The digital centre could become underused if training is not tied to qualifications, remote-work opportunities, business mentoring and reliable connectivity.
Open 4 testable policy questions
  1. Hypothesis

    An agriculture aggregation and cold-chain hub with contracts to hotels, schools and supermarkets could raise farm-gate income more than isolated input grants.

    How to check: Map producers and volumes; measure spoilage and transport costs; pilot one buyer-linked crop cluster and compare net income.
  2. Hypothesis

    Outcome-linked digital training: credentials, portfolios, apprenticeships and remote-work placement: would deliver more employment than general computer access alone.

    How to check: Track enrollment, completion, certification, job placement, business starts and six-month earnings by age and sex.
  3. Hypothesis

    A published feeder-road, culvert and drain maintenance schedule would produce large reliability gains at lower cost than repeated emergency repair.

    How to check: Geotag defects and closures; compare travel time, school/work absence and emergency-repair spending before and after preventive maintenance.
  4. Hypothesis

    Combining land regularization with hazard screening, drainage and low-cost retrofit finance would unlock safer household investment.

    How to check: Audit parcels for hazard/access conditions and compare home-improvement investment and insurance uptake across package designs.

Current stage of projects and commitments.

Status reflects the latest clear source in this research base. “Planned,” “under way” and “operating” are different claims.

Project stageDelivered or operatingA source reports that the project opened, was handed over or is operating.Open 2 recordsClose 2 records
2025-05-16

Grande Riviere Digital Development Centre

Latest sourced status: operational

Opened at the Human Resource Development Centre with free digital access, training, coworking and DigiGov services.

S016Govt. of Saint Lucia
Project stageIn progressA current source shows construction, procurement, commissioning or another active delivery step.Open 5 recordsClose 5 records
2026-08-11

Dennery North Water Supply Redevelopment Project

Latest sourced status: government completion/commissioning ceremony held; CDB project page remains Under Implementation

Government marked completion on 30 July 2020 after intake, treatment, pumping, storage and distribution works and estimated about 8,000 service beneficiaries and 105 local workers. CDB's live page, last updated 11 August 2026, still reports 'Under Implementation'; financial/project closure and current performance are therefore unresolved.

S017Govt. of Saint LuciaS058Caribbean Development Bank
2025-07-29

Richfond Wellness Centre improvements

Latest sourced status: ongoing at last authoritative update; current completion unverified

Infrastructure, patient-flow and climate-resilience improvements were underway.

S020Government of Saint Lucia /
2024-04-26

Invest Saint Lucia land rationalization

Latest sourced status: programme commenced; constituency completion data unavailable

Dennery North was named among target constituencies for subsidized conversion of eligible occupation of government land into ownership.

S021Government of Saint Lucia /
2025-01-12

Grande Riviere TVET transformation and school repair programme

Latest sourced status: TVET commissioning reported; course delivery and repair completion unverified

The 2024-25 Budget described Grande Riviere Secondary's transformation toward sustainable agriculture, culinary arts and entrepreneurial services and planned major repairs at Grande Riviere Secondary and La Ressource Combined. The Prime Minister later reported a Dennery TVET school commissioned in September 2024, but did not document those repair packages as complete.

S030Govt. of Saint LuciaS061Government of Saint Lucia /
2026-08-11

BRACCVAS Dennery agriculture-resilience workstream

Latest sourced status: active at latest CDB impact update; constituency allocation unspecified

CDB reports erosion-control/land-restoration planting from the Dennery nursery, technical training, youth/equity measures and ongoing soil/water adaptation under a US$9.8 million Adaptation Fund-backed national project.

S062Caribbean Development Bank
Project stagePlanned or fundedFunding, a budget line or an announced plan exists, but delivery is not yet established.Open 2 recordsClose 2 records
2026/27 fiscal yearBudget line · EC$5,682,032

Marc-Dennery Roads Project

Latest sourced status: Budgeted in 2026/27 Estimates; delivery not independently verified

S006Government of Saint Lucia, M
2026/27 fiscal yearBudget line · EC$492,000

Upgrade of Dennery Mechanical Workshop

Latest sourced status: Budgeted in 2026/27 Estimates; delivery not independently verified

S006Government of Saint Lucia, M
National programmes relevant to this areaNational envelopes are not local allocationsOpen 3 recordsClose records

These programmes apply across Saint Lucia. The amounts below are national 2026/27 budget envelopes; this research base does not establish how much is allocated to or spent in Dennery North.

National programme

Community Development Programme

National envelope · EC$20,879,136

Budgeted in 2026/27 Estimates; no constituency split supplied in this dataset

S006Government of Saint Lucia, M
National programme

Community Tourism Programme

National envelope · EC$3,000,000

Budgeted in 2026/27 Estimates; no constituency split supplied in this dataset

S006Government of Saint Lucia, M
National programme

Tourism Enhancement Programme

National envelope · EC$5,565,900

Budgeted in 2026/27 Estimates; no constituency split supplied in this dataset

S006Government of Saint Lucia, M

Review the findings, sources and missing information.

The notebook keeps sourced facts, institutional context and SLPA analysis visible as different kinds of evidence.

How the evidence labels work
Published fact

A sourced official or primary record

Institutional context

An older or broader institutional source

SLPA synthesis

Analysis that must not be read as an official finding

Hypothesis

A testable question that needs local evidence

Research notesKey numberOpen 7 findingsClose findings
  1. Published factconstituency-specific; provisional

    Household population: 7000; unit: people (2022 census night (12-13 March 2022); geography: Dennery North electoral constituency; scope label: constituency-specific; provisional; notes: Table 7/A.8 reports 7,000, down 8.8% from 7,679 in 2010. The same row's male/female counts sum to 7,270, so sex counts are intentionally not reproduced and the headline total should be treated cautiously.).

    Table 7/A.8 reports 7,000, down 8.8% from 7,679 in 2010. The same row's male/female counts sum to 7,270, so sex counts are intentionally not reproduced and the headline total should be treated cautiously.S004CSO
  2. Published factconstituency-specific; provisional

    Private households: 2657; unit: households (2022 census; geography: Dennery North electoral constituency; scope label: constituency-specific; provisional).

    S004CSO
  3. Published factconstituency-specific

    Land area: 10.83; unit: square miles (2022 census geography; geography: Dennery North electoral constituency; scope label: constituency-specific).

    S004CSO
  4. Published factconstituency-specific

    Official 2025 register: 8,861 published entries. This is an administrative register, not a resident-adult or population count.

    Updated to the Electoral Department’s current official 2025 results surface.S002Electoral Dept.
  5. Published factconstituency-specific

    Official 2025 result: 4,873 ballots cast against 8,861 published register entries; 55.0% published turnout; 67 rejected ballots.

    Updated to the Electoral Department’s current official 2025 results surface.S002Electoral Dept.
  6. Proxyadministrative-district proxy; not constituency-specific

    Unemployment rate: 10.17; unit: percent (2025 annual; geography: Dennery administrative district; scope label: administrative-district proxy; not constituency-specific; notes: Male 4.50%; female 23.02%, indicating a large district-level gender gap.).

    Male 4.50%; female 23.02%, indicating a large district-level gender gap.S014CSO
  7. Proxyolder administrative-district proxy; not constituency-specific

    Poverty headcount: 45.0; unit: percent (2016; geography: Dennery administrative district; scope label: older administrative-district proxy; not constituency-specific; notes: Useful as a historical vulnerability signal, not a current constituency estimate.).

    Useful as a historical vulnerability signal, not a current constituency estimate.S015CSO
Research notesEconomyOpen 4 findingsClose findings
  1. Proxyadministrative-district proxy plus geographic inference

    Agriculture and associated transport, input supply and informal trade are a central valley livelihood base. The 2022 census records substantial agricultural land use and livestock in the Dennery administrative district, but does not allocate those figures reliably between North and South.

    S004CSO
  2. ProxyDennery-area programme proxy; constituency allocation unspecified

    BRACCVAS provides active climate-smart agriculture support in the wider Dennery area: CDB reports a forest nursery producing more than 10,000 plants for erosion control/land restoration, training in GPS/GIS, youth and equity work, and ongoing soil-conservation, rainwater-harvesting and efficient-watering measures. The source does not allocate beneficiaries between Dennery North and South.

    S062Caribbean Development Bank
  3. SLPA synthesiscommunity-specific facilities; no constituency employer census

    Public services, schools, health facilities, construction and small retail/service businesses are local employment anchors. The Grande Riviere Digital Development Centre adds a platform for training, coworking and micro-enterprise support.

    S016Govt. of Saint LuciaS018Government of Saint Lucia / S020Government of Saint Lucia /
  4. SLPA synthesisdata gap

    No authoritative current inventory of major private employers, firm employment, farm output or value-chain earnings was found for Dennery North.

Research notesInfrastructure and servicesOpen 4 findingsClose findings
  1. WaterSLPA synthesis

    The Government marked completion/commissioning of Dennery North water-supply works on 30 July 2020 after intake, treatment, pumping, storage and distribution construction. However, CDB's live project page still labels the broader project 'Under Implementation' as of its 11 August 2026 update. Treat the physical commissioning ceremony as verified, but financial/project closure and current operating performance as unresolved. Government's roughly 8,000-person figure is a service estimate, not census population.

    S017Govt. of Saint LuciaS058Caribbean Development Bank
  2. Roads Transport DrainageSLPA synthesis

    The dispersed valley and hillside settlement pattern makes feeder-road condition, culverts, slope stability and dependable links to the East Coast Road essential. No current constituency road-condition or public-transport dataset was found.

    S010Electoral Department of SainS054Government of Saint Lucia /
  3. DigitalSLPA synthesis

    The Grande Riviere Digital Development Centre, opened 16 May 2025, includes a computer lab, training/conference space, coworking, internet-cafe functions, a DigiGov bureau and free public access services.

    S016Govt. of Saint Lucia
  4. Community And EmergencySLPA synthesis

    The official 2024-25 shelter list included facilities in La Ressource, Grande Riviere, Gadette, Richfond, Aux Lyon and Derniere Riviere. Certification and capacity should be rechecked for the current hurricane season.

    S022Government of Saint Lucia /
Research notesEducationOpen 4 findingsClose findings
  1. SLPA synthesis

    The constituency has multiple combined/primary and secondary-school facilities reflected in official polling and shelter records, including Grande Riviere Secondary, La Ressource Combined, Richfond Combined, Aux Lyon Combined and Derniere Riviere Combined. Current enrollment, attendance, exam outcomes, special-needs capacity and facility-condition data were not found at constituency level.

    S010Electoral Department of SainS022Government of Saint Lucia /
  2. SLPA synthesis

    The new digital centre is a positive education-to-employment asset, but its reach and outcomes require measurement beyond counts of visits or training sessions.

    S016Govt. of Saint Lucia
  3. SLPA synthesis

    The 2024-25 Budget said Grande Riviere Secondary was being transformed into an institute for Sustainable Agriculture, Culinary Arts and Entrepreneurial Services; the Prime Minister's January 2025 address separately reported that a Dennery TVET school was commissioned in September 2024. These sources support an important TVET direction, but do not verify current course delivery, enrollment or graduate outcomes.

    S030Govt. of Saint LuciaS061Government of Saint Lucia /
  4. SLPA synthesis

    The 2024-25 Budget listed major repairs for La Ressource Combined and Grande Riviere Secondary. No authoritative completion evidence for those repair packages was found, so they remain commitments rather than completed assets.

    S030Govt. of Saint Lucia
Research notesHealthOpen 3 findingsClose findings
  1. SLPA synthesis

    La Ressource Wellness Centre reopened on 28 February 2025 after a 2015 fire, restoring maternal and child health, chronic-disease, general, mental-health, men's-health, podiatry and other primary services.

    S018Government of Saint Lucia /
  2. SLPA synthesis

    Dental care was re-established at La Ressource in March 2026 for children and adults in the Dennery Valley.

    S019Government of Saint Lucia /
  3. SLPA synthesis

    Infrastructure and patient-flow improvements at Richfond Wellness Centre were reported ongoing in July 2025, with climate resilience among the objectives; no subsequent completion notice was located.

    S020Government of Saint Lucia /
Research notesSafetyOpen 2 findingsClose findings
  1. SLPA synthesis

    A geographically distributed shelter network is an asset, but current certified capacity, accessibility, backup power/water and transport plans were not available.

    S022Government of Saint Lucia /
  2. SLPA synthesis

    No constituency-level police-recorded crime, domestic violence, road-crash or emergency-response-time data were found; claims about local crime trends would therefore be speculative.

Research notesEnvironment and climateOpen 2 findingsClose findings
  1. SLPA synthesisgeographic/institutional evidence; risk not quantified by constituency

    River-valley and hillside settlements face intense-rainfall runoff, river/culvert flooding, erosion and landslide-related access disruption. The wider Dennery watershed contains dry-forest and riparian conservation priorities.

    S010Electoral Department of SainS054Government of Saint Lucia /
  2. SLPA synthesisconstituency project context and unresolved current performance

    Dennery North's pre-project system faced acute dry-season shortages, rainy-season turbidity, outdated infrastructure and disruption to households and businesses. Major works were ceremonially commissioned in 2020, but no current public continuity or water-quality performance series was found and CDB still labels the project under implementation.

    S017Govt. of Saint LuciaS058Caribbean Development BankS059Caribbean Development Bank
Research notesStrength / assetOpen 3 findingsClose findings
  1. SLPA synthesis

    Major water infrastructure ceremonially commissioned by government, restored primary/dental care and a new digital-development centre create a stronger basic-services platform than existed a decade ago; CDB's continuing 'Under Implementation' label means the water project's overall closure should not be described as complete.

    S016Govt. of Saint LuciaS017Govt. of Saint LuciaS058Caribbean Development BankS018Government of Saint Lucia / S019Government of Saint Lucia /
  2. SLPA synthesis

    Fertile valley land, established farming knowledge, multiple settlements and proximity to the East Coast Road support food production and distributed small enterprise.

    S010Electoral Department of SainS004CSOS062Caribbean Development Bank
  3. SLPA synthesis

    The land-rationalization programme offers a route from insecure occupation of state land to formal ownership for eligible households in Dennery North and South.

    S021Government of Saint Lucia /
Research notesWhat is workingOpen 4 findingsClose findings
  1. SLPA synthesis

    Basic-service restoration has been unusually concrete: major water works were ceremonially commissioned, La Ressource health services reopened, dental services were restored, and a multipurpose digital centre is operational. CDB's current project-status discrepancy is retained rather than overwritten.

    S016Govt. of Saint LuciaS017Govt. of Saint LuciaS058Caribbean Development BankS018Government of Saint Lucia / S019Government of Saint Lucia /
  2. SLPA synthesis

    The digital centre combines access, training, coworking and e-government rather than treating connectivity as a standalone computer lab.

    S016Govt. of Saint Lucia
  3. SLPA synthesis

    The health-upgrade programme explicitly includes patient flow and climate resilience, which is appropriate for a storm-exposed rural service network.

    S020Government of Saint Lucia /
  4. SLPA synthesis

    Active BRACCVAS work in the wider Dennery farming area combines erosion-control planting, technical capacity, youth/equity attention and water/soil adaptation rather than a single input distribution.

    S062Caribbean Development Bank
Research notesChallengeOpen 3 findingsClose findings
  1. Proxyadministrative-district proxy

    High historical poverty and a very large female unemployment rate in the wider Dennery district point to weak household income security and gendered barriers to paid work.

    S014CSOS015CSO
  2. SLPA synthesisgeographic inference

    Dispersed settlements increase the cost of maintaining feeder roads, drains, public transport, health outreach and school access.

    S010Electoral Department of Sain
  3. SLPA synthesisprogramme-defined need

    Formal land tenure, hazard-safe housing improvement and access to affordable finance remain linked challenges for households covered by land rationalization.

    S021Government of Saint Lucia /
Research notesPotentially neglected issueOpen 3 findingsClose findings
  1. SLPA synthesis

    Operations and maintenance after capital delivery: water intakes, pumps, drains, feeder roads, shelters and wellness facilities: may receive less attention than construction announcements.

    Several official sources announce or complete capital works, while routine performance and maintenance indicators are absent.S017Govt. of Saint LuciaS020Government of Saint Lucia / S022Government of Saint Lucia /
  2. SLPA synthesis

    Care burdens, transport and flexible training/work arrangements for women may be under-addressed despite the district's 2025 female unemployment rate of 23.02%.

    District-level gender gap; causes require household research.S014CSO
  3. SLPA synthesis

    The digital centre could become underused if training is not tied to qualifications, remote-work opportunities, business mentoring and reliable connectivity.

    The facility offer is documented, but outcomes and labour-market pathways are not.S016Govt. of Saint Lucia
Open evidence gaps

What we still need to know

  1. 01

    Resolve the 2022 provisional census internal inconsistency for Dennery North and reconcile Table 7/A.8 with settlement Table A.10 before publishing a map pop-up.

    Needed to distinguish evidence-backed need from a planning hypothesis and to support map-ready local analysis.

    Useful next source: Community validation, agency administrative data or constituency-level release
  2. 02

    Current constituency-level employment, income, poverty, business, agriculture-output and major-employer data.

    Needed to distinguish evidence-backed need from a planning hypothesis and to support map-ready local analysis.

    Useful next source: Community validation, agency administrative data or constituency-level release
  3. 03

    Water continuity, pressure, water-quality, non-revenue-water and customer-complaint performance after the 2020 government commissioning ceremony, plus reconciliation of CDB's current Under Implementation status.

    Needed to distinguish evidence-backed need from a planning hypothesis and to support map-ready local analysis.

    Useful next source: Community validation, agency administrative data or constituency-level release
  4. 04

    Feeder-road, bridge, drain and public-transport condition/inventory by community.

    Needed to distinguish evidence-backed need from a planning hypothesis and to support map-ready local analysis.

    Useful next source: Community validation, agency administrative data or constituency-level release
  5. 05

    Current school enrollment, attendance, attainment, special-needs services and facility condition.

    Needed to distinguish evidence-backed need from a planning hypothesis and to support map-ready local analysis.

    Useful next source: Community validation, agency administrative data or constituency-level release
  6. 06

    Health staffing, wait time, referral, ambulance response and community disease-burden measures.

    Needed to distinguish evidence-backed need from a planning hypothesis and to support map-ready local analysis.

    Useful next source: Community validation, agency administrative data or constituency-level release
  7. 07

    Police-recorded crime, domestic violence, road safety and emergency response at a publishable subnational geography.

    Needed to distinguish evidence-backed need from a planning hypothesis and to support map-ready local analysis.

    Useful next source: Community validation, agency administrative data or constituency-level release
  8. 08

    Current status and parcel outcomes of land rationalization; completion status for Richfond works.

    Needed to distinguish evidence-backed need from a planning hypothesis and to support map-ready local analysis.

    Useful next source: Community validation, agency administrative data or constituency-level release
  9. 09

    Current Grande Riviere TVET course offerings, enrollment, certification, placement outcomes and completion of the separately budgeted Grande Riviere/La Ressource school repairs.

    Needed to distinguish evidence-backed need from a planning hypothesis and to support map-ready local analysis.

    Useful next source: Community validation, agency administrative data or constituency-level release
  10. 10

    Which Dennery communities/farms receive BRACCVAS support and the constituency-level output/outcome split.

    Needed to distinguish evidence-backed need from a planning hypothesis and to support map-ready local analysis.

    Useful next source: Community validation, agency administrative data or constituency-level release
  11. 11

    The official table reports 3,524 male and 3,746 female residents, which does not reconcile to the stated 7,000 household-population total; do not derive a sex ratio from these fields.

    The published census fields do not support an unqualified comparison or derived measure.

    Useful next source: Central Statistical Office clarification or corrected final census table
Source register19 records linked to this profileOpen sourcesClose sources
  1. S002
    2025 General Election Results (opens in a new tab)

    Saint Lucia Electoral Department · 2025-12-01

    Official / primary
  2. S061
    2025 New Year's Address (opens in a new tab)

    Government of Saint Lucia / Office of the Prime Minister · 2025-01-12

    Primary executive address; commissioning and future-rehabilitation statements are kept distinct.
    Official / primary
  3. S030
    Budget Address 2024-2025 (opens in a new tab)

    Government of Saint Lucia · 2024-04

    Primary policy/budget statement; commitment does not establish completion or impact.
    Official / primary
  4. S062
    Building Resilience: Transforming Saint Lucia's Agriculture Sector in the Face of Climate Change (opens in a new tab)

    Caribbean Development Bank

    Primary lender/implementing-partner impact update with no displayed publication date. Dennery activity is explicit, but electoral constituency and beneficiary-community allocation is not.
    Official / primary
  5. S010
    Dennery North (P) Information (opens in a new tab)

    Electoral Department of Saint Lucia

    Primary electoral geography; spellings are normalized only where an obvious variant is shown alongside the official form.
    Official / primary
  6. S058
    Eighth Water (Dennery North Water Supply Redevelopment Project) (opens in a new tab)

    Caribbean Development Bank · 2016-05

    Current primary lender project-status page. Its Under Implementation label conflicts with the government's 2020 completion ceremony, so both are retained and project closure is marked unresolved. Currency is not specified beside the page's approved-total figure and is therefore not inferred.
    Official / primary
  7. S006
    Estimates of Revenue and Expenditure 2026/2027 (opens in a new tab)

    Government of Saint Lucia, Ministry of Finance · 2026

    Official / primary
  8. S021
    Homeownership to be more affordable for Saint Lucians (opens in a new tab)

    Government of Saint Lucia / Office of the Prime Minister · 2024-04-26

    Primary announcement; current parcel/completion outcomes not provided.
    Official / primary
  9. S020
    Ministry of Health embarks on strategic infrastructural improvements to enhance primary health care delivery (opens in a new tab)

    Government of Saint Lucia / Ministry of Health · 2025-07-29

    Primary status update; no later completion source was found.
    Official / primary
  10. S016
    New ICT centre opens in Dennery (opens in a new tab)

    Government of Saint Lucia · 2025-05-21

    Primary project/opening release; no outcome evaluation.
    Official / primary
  11. S018
    Official reopening of the La Ressource Wellness Centre, Dennery (opens in a new tab)

    Government of Saint Lucia / Ministry of Health · 2025-03-04

    Primary health-service release hosted on a cross-ministry subdomain.
    Official / primary
  12. S004
    Saint Lucia Provisional Census Report 2022: Release 2 Rev. 2.7 (opens in a new tab)

    Central Statistical Office of Saint Lucia / CARICOM mirror · 2025

    Official / primary
  13. S019
    The Ministry of Health, Wellness and Nutrition reestablishes dental services at the La Ressource Wellness Centre (opens in a new tab)

    Government of Saint Lucia / Ministry of Health · 2026-03-19

    Current primary service announcement.
    Official / primary
  14. S014
    Unemployment Rates by District and Sex (Annual) 2010 to 2025 (opens in a new tab)

    Central Statistical Office of Saint Lucia · 2026-04-02

    Current primary labour-force table. The site displays the ambiguous raw date 2/4/2026; normalized here as 2 April 2026 under Saint Lucia's day/month convention while retaining the raw value. Districts are not constituencies.
    Official / primary
  15. S059
    CDB approves USD11.2 mn St. Lucia Water Supply Project (opens in a new tab)

    Caribbean Development Bank · 2016-05-31

    Primary institutional approval source but older; use for baseline/problem and design context, not current service performance.
    Institutional / older
  16. S017
    Dennery North Water Project completed (opens in a new tab)

    Government of Saint Lucia · 2020-08-07

    Primary government record of a completion/commissioning ceremony, but now six years old; beneficiary figure is a service estimate, not population. CDB source S052 still marks the broader project Under Implementation as of 2026-08-11, so this source must not be used alone to assert current project closure.
    Institutional / older
  17. S022
    New list of emergency shelters per district for 2024-25 (opens in a new tab)

    Government of Saint Lucia / National Emergency Management Organisation · 2024-06-30

    Primary but supersession/certification must be checked for 2026. Shelter district grouping may not exactly follow electoral boundaries.
    Institutional / older
  18. S054
    Saint Lucia Forests and Lands Resources Department Strategy 2015-2025 (opens in a new tab)

    Government of Saint Lucia / Forests and Lands Resources Department · 2015

    Official but older strategic baseline; use for landscape significance, not current ecological condition.
    Institutional / older
  19. S015
    Summary Report: Saint Lucia 2016 National Report of Living Conditions (opens in a new tab)

    Central Statistical Office of Saint Lucia · 2018-12

    Official but old and geographically broader than the constituencies; not a current poverty estimate.
    Institutional / older